Working on a Seattle restaurant opening, relocation or remodel? Send the basics through this form and ClearMax Labs will look at the cabling, WiFi, cameras, door readers and screens it involves. A real person reads it and replies with whatever the plan is still missing. Email works too: jalen@clearmaxlabs.com.
Last updated: November 2026
Tell us about the Seattle space
Calls to this number may be recorded or answered by an automated assistant. Please do not share customer or payment card information by phone.
Helpful to include
- The starting point: empty shell, second-generation restaurant, or a remodel of the room you run now, plus the neighborhood.
- Drawings from the architect, or a phone picture of the sketch you have.
- Target opening, any booked POS appointment, the reader doors, and the views the cameras need.
Those details shape the quote; a change after work begins is flagged and priced before it goes ahead. SDCI says you need an electrical permit any time electrical wiring is installed, altered, extended, or connected to any electrical equipment. The code's exemption for communication wiring and optical fiber cables, under NEC Chapter 8 and Article 770, is written for one- and two-family dwellings. A separate electrical permit is also required for each separate building or structure. Each permit is listed in the scope with a date. Keep card numbers and passwords off the form.
